Land for sale
Key information
Property description & features
• Water supply has been successfully connected to the site.
• Planning Reference: 2021/0344/PPP.
• The site for sale extends to about 0.21 acres.
• We understand that mains electricity is available in the vicinity.
• We understand that telephony/broadband is in the vicinity.
• The site is serviced by a septic tank.
Situation
Ground North of Cedar House in Lochgoilhead enjoys excellent views towards Loch Goil. The site is circa 0.4 miles from the village of Lochgoilhead, a further 13.3 miles from Arrochar on Loch Long and 33.7 miles from the town of Helensburgh, all of which have good local shops and services which cater for most everyday needs and requirements. Glasgow is a further 57 miles and offers a full range of higher and further education services as well as all the cultural and professional services normally connected with a major city. Glasgow Airport at 47 miles distant. Primary schooling is available at Lochgoilhead, and secondary schooling at Dunoon. The A83 and A82 provide quick access to Central Scotland and Arrochar has a main line rail station with services to and from Glasgow city centre as well as a sleeper to London. Located at the north end of the Argyll Forest Park and within the Loch Lomond & Trossachs National park, the surrounding area offers much in the way of outdoor pursuits including cycling routes, challenging hill climbs, walks, many miles of forest tracks for horse riding and other outdoor pursuits. The River Goil has a good run of sea trout and salmon, fishing permits for which can be acquired locally. Sea and loch fishing is also available in the area as well as a number of commercially run shoots and excellent stalking opportunities. Day permit red deer stalking is available from the Forestry Commission.
Planning Consent
The site has outline planning consent for the erection of one dwelling property (for holiday use).
Planning Reference - 2021/0344/PPP.
Travel Directions
From the Erskine Bridge travel west on the A82 signposted to Dumbarton continue on the A82 to through Dumbarton and along the west bank of Loch Lomond until reaching Tarbert. At Tarbert continue straight on onto the A83 continue on this road for a further 8 miles and as you get to the 'Rest and be Thankful' turn left following signs for Lochgoilhead on the B828, after about 3.5 miles bear left onto the B839 and continue for about 2 miles and before entering Lochgoilhead turn right over the bridge and continue through Drumsynie village on the minor coastal road which leads after circa 0.4 miles to the Ground North of Cedar House. The site is on the right-hand side.
Local Authorities
Argyll & Bute Council
[use Contact Agent Button]
Services
There is a water supply connected to the site.
There is a septic tank located on the site.
Electricity is in the vicinity, as yet not connected.
Viewing
Strictly by appointment with Robb Residential on[use Contact Agent Button].
Possession
Vacant possession will be given on completion.
Offers
Offers are to be submitted in Scottish legal terms to the selling agents Robb Residential, 176 St. Vincent Street, Glasgow, G2 5SG. A closing date for offers will probably be fixed and prospective purchasers are advised to register their interest with the selling agents in order to be kept fully informed of any closing date that may be fixed.
Photographs and particulars taken November 2023."
" "
"
Places of interest
See more properties like this:
*DISCLAIMER
Property reference GLG230184. The information displayed about this property comprises a property advertisement. OnTheMarket.com makes no warranty as to the accuracy or completeness of the advertisement or any linked or associated information, and OnTheMarket.com has no control over the content provided by the agent or developer. This property advertisement does not constitute property particulars. The information is provided and maintained by Robb Residential - Glasgow.
OnTheMarket may have applied supplementary data to this property listing, including:
Broadband availability and predicted speed
Broadband speed is measured in megabits per second, with the number returned showing how fast the connection is. Each reading is based on the highest predicted speed of any major broadband network for services that deliver the download speeds. The following are the different readings that we may display:
Basic: Up to 30 Mbit/s
Super-fast: Between 30 Mbit/s and 300 Mbit/s
Ultra-fast: Over 300 Mbit/s
The data is updated three times a year. The checker results are predictions and should not be regarded as guaranteed. For more information, see: https://checker.ofcom.org.uk/en-gb/about-checker#Answer_0_2
Mobile phone signal availability and predicted strength
Mobile signal predictions are provided by the four UK mobile network operators: EE, O2, Three and Vodafone. Predictions can vary significantly from the coverage you may actually experience as a result of local factors (especially terrain). Ofcom has tested the actual coverage provided in various locations around the UK to help ensure that these predictions are reasonable. The values shown against a property can be broken down as follows:
Clear: No bars, no signal predicted
Red: One bar, reliable signal unlikely
Amber: Two bars, may experience problems with connectivity
Green: Three bars, likely to have good coverage and receive a data rate to support basic web services
Enhanced: Full bars, likely to have good coverage indoors and to receive an enhanced data rate to support multimedia services
Energy Performance data and Internal floor area
Any supplementary data should not be relied upon as forming part of any property particulars and OnTheMarket cannot be held responsible for any incorrectness in this data. See here for more information.