Land to rent
Key information
Property description & features
- To be let by tender Proposed start date 1st March 2025
- DEADLINE FOR TENDERS 30th January @ 17:00, please note any submitted after this time and date will not be considered.
- Open viewings pre registration is required
- Tuesday 17th December 2024 @12:00 to 14:00
- Tuesday 14th Jan 2025 @12:00 to 14:00
The Location
Fieldhead Campsite is situated within the village of Edale, in the Hope Valley, which is central to The Peak District National Park, as shown on the map enclosed with these particulars. Edale is the starting point of The Pennine Way, which leads walkers across the vast heather moorlands of the Northern Uplands, starting with Kinder Scout.
The site is a peaceful location despite the significant attraction of the area to large visitor numbers both to Edale and the surrounding district including villages such as Castleton (6km) and Hathersage (13km).
Edale is well served by Public Transport, which includes regular buses and trains with an Edale stop along the picturesque route (Hope Valley line) between Sheffield and Manchester.
Facilities of the village include Pubs, cafes and small post office/general store.
The site
The site, which is shown on the plan attached, is available for tents only, up to a maximum of 45 pitches. It has toilet blocks and showers for ladies, gents and the less mobile, as well as store rooms, an office and washing up room. A wardens room provides capacity for simple unfurnished overnight accommodation.
The buildings form part of the Visitor and Moorland Centre that are owned by the National Park Authority (this is a multi-user area). Advice on local attractions is on hand including suggestions for walking, biking, climbing and a wider range of outdoor activities.
The campsite has been in operation for nearly 40 years and has a good customer base that includes Ramblers, Duke of Edinburgh and School groups whilst also a popular family destination.
There is a small parking area suitable for around 20 car spaces. There is a pay and display public car park with 138 spaces approximately 300m away from the campsite.
It is expected that encouragement will be given to visitors with regards to the use of public transport.
The site fees for 2024 have been
Adults (16+) from £11.00 (£12.00 bank holidays)
Juniors (under 17) from £6.00
Children (under 5’s) from £2.00
Cars from £5.00
Showers 20p
Educational Groups by arrangement
Dogs from £2.50
Large tents, store tents, gazebo’s etc. may be subject to additional surcharge (£10.00)
The new tenant would not be bound by these charges which are offered as an indicative market rate. Seasonal variations may apply but the charges should reflect the policies of the National Park Authority.
The tenancy
Term
The campsite will initially be let for three years from 1st March 2025 to 30th April 2028 on a business tenancy under the Landlord and Tenancy Act 1954 (with security of tenure provisions excluded).
Site and user
The site is as indicated on the plan attached. Use will be restricted to the 45 tent sites and available parking.
The Authority will reserve rights to use the hatched area for events associated with their retained property.
The minimum period over which the campsite will remain available for business will be 1st April (or the Easter period if in March) to 31st October but may, subject to the tenants objectives, remain open throughout the year.
Rent
Applicants should submit their applications as requested to include a formal tender with regards to rent considered appropriate for their business plan which should be included within the tender process.
Rent will be payable 6 monthly in arrears due on 30th August (for period March to August inclusive) and 28th February (for period September to February inclusive). PLUS VAT
Repairs
The Authority will be responsible for repairs to the structure, exterior of the building, installations for the supply of services, external decoration.
The Tenant will be responsible for internal repairs and decoration, fences, drives, grounds and the cost of servicing appliances. The tenant will be responsible for ensuring that the septic tank is emptied as necessary and reimburse service costs and other outgoings charged to the campsite.
Insurance
The Authority will ensure the buildings but the tenant be will required to cover other matters with regards to their business including equipment and public and employers and other relevant liabilities.
Authority reservations
Sporting rights, all timber and tree management, private water supply, filming/photography rights, easements and wayleaves, minerals.
Subletting
The property shall be occupied as a business venture by the named tenant only. There will be no right to assign, sub-let or part with possession for the whole or any part of the premises.
Services
Single phase mains electricity
Mains and spring fed water supply to ground floor WC within
Telephone (subject to British Telecom regulations)
Hot water storage tank.
Broadband available
Waste handling – the tenant will make their own arrangements with regards to waste handling and recycling
NB Hot water and electric charges are billed from PDNPA on a user basis shared with Moors for the Future (occupiers of the PDNPA visitor complex)
Outgoings and Council Tax
The tenant is to pay Commercial Rates, and all other outgoings relating to the property.
Subject to any available rates allowances it is understood that the current rateable value is £13,900 per annum at a rate of 0.546 pence (or 49.9 small) in the pound (c. £7600 or c. £7000 (if small) per annum paid).
Subject to exemptions that may apply.
Local Authority – High Peak Borough Council
Ingoings
Subject to separate negotiation with the outgoing tenants certain fixtures and fittings may be available to purchase. An itinerary of such items is included with these particulars.
APPLICATION AND TENDERING PROCESS
What we are looking for -:
All applicants are invited to tender but the following attributes may be advantageous -:
•Experience of managing a similar business and property
•Knowledge of Peak District National Park Policies and Objectives
•Good communication skills in dealing with the public
•Local knowledge
How to apply -:
1.Contact Richard Attwood @ ELR and make arrangements to view the property (on the viewing day)
2.Complete the attached application forms and tender
3.Return these together with a Business Plan (all marked Private and Confidential) to the address indicated by the stated deadline date
4.Interviews will be arranged for those shortlisted
Selection
It is anticipated that a decision on the applicant selected should take place by early February 2025
The Authority does not bind itself to accept the highest or any other tender. The particulars are produced in good faith and are set out as a general guide and do not constitute or form any part of an offer or contract.
Prospective applicants are asked not to visit the property at any other time apart from on the official viewing day
DEADLINE FOR TENDERS 30th January @ 17:00, please note any submitted after this time and date will not be considered.
OPEN VIEWING: PRE REGISTRATION IS REQUIRED
Tuesday 17th December 2024 @12:00 to 14:00
Tuesday 14th Jan 2025 @12:00 to 14:00
Property information from this agent
Places of interest
See more properties like this:
*DISCLAIMER
Property reference 33555514. The information displayed about this property comprises a property advertisement. OnTheMarket.com makes no warranty as to the accuracy or completeness of the advertisement or any linked or associated information, and OnTheMarket.com has no control over the content provided by the agent or developer. This property advertisement does not constitute property particulars. The information is provided and maintained by Eadon Lockwood & Riddle - Sheffield Lettings.
OnTheMarket may have applied supplementary data to this property listing, including:
Broadband availability and predicted speed: obtained from Ofcom on January 26, 2023
Broadband speed is measured in megabits per second, with the number returned showing how fast the connection is. Each reading is based on the highest predicted speed of any major broadband network for services that deliver the download speeds. The following are the different readings that we may display:
Basic: Up to 30 Mbit/s
Super-fast: Between 30 Mbit/s and 300 Mbit/s
Ultra-fast: Over 300 Mbit/s
The data is updated three times a year. The checker results are predictions and should not be regarded as guaranteed. For more information, see: https://checker.ofcom.org.uk/en-gb/about-checker#Answer_0_2
Mobile phone signal availability and predicted strength: obtained from Ofcom on January 26, 2023
Mobile signal predictions are provided by the four UK mobile network operators: EE, O2, Three and Vodafone. Predictions can vary significantly from the coverage you may actually experience as a result of local factors (especially terrain). Ofcom has tested the actual coverage provided in various locations around the UK to help ensure that these predictions are reasonable. The values shown against a property can be broken down as follows:
Clear: No bars, no signal predicted
Red: One bar, reliable signal unlikely
Amber: Two bars, may experience problems with connectivity
Green: Three bars, likely to have good coverage and receive a data rate to support basic web services
Enhanced: Full bars, likely to have good coverage indoors and to receive an enhanced data rate to support multimedia services
Energy Performance data and Internal floor area
Any supplementary data should not be relied upon as forming part of any property particulars and OnTheMarket cannot be held responsible for any incorrectness in this data. See here for more information.